Amplex-Emirates successfully conducted the first energy storage project for renewable energy application as a pilot project for Dubai’s utility DEWA
The project was to evaluate the technical capabilities of NAS Battery Technology, by NGK Insulators, to improve the integration the renewable energy in DEWA’s electricity grid. The project supports DEWA’s efforts to promote clean energy production and storage technologies.
NGK Insulators supplied its NAS batteries and INGETEAM was responsible for the supply of a 1.2 MW Power Conversion System (PCS) with its medium voltage components including power transformer, MV switchgear, and the Power Plant Controller (PPC).
The battery storage facility was built at the world’s largest solar park, Mohammed Bin Rashid Al Maktoum Solar Park in Dubai making it the region’s first storage system to be twinned with a PV plant at a grid-scale.