Al Ain Water Transmission Scheme (AWTS) Tap Off 9A (FWTS) to Al Hayer (Lot P1) – Pipeline Section From Khryer to Umm Ghaffa Floating Reservoir Stations-Lot C

21 January 2019
TRANSCO/SEDE
Al Ain
ILF

Media

Technology Partners

Full

auto operation programming to achieve unmanned operation

Fully

integrating the Tap-offs to AARC for Remote operation

The project’s scope included the design, installation, and testing & commissioning for the complete scope of control system, local HMI, field instrumentation, electrical panels and fiber optic works for three Tap-offs along TRANSCO’s pipeline.

Amplex-Emirates also responsible for the integration of the control system with the main SCADA in Al Ain Reception Complex (AARC)