The project’s scope included the design, installation, and testing & commissioning for the complete scope of control system, local HMI, field instrumentation, electrical panels and fiber optic works for three Tap-offs along TRANSCO’s pipeline.
Amplex-Emirates also responsible for the integration of the control system with the main SCADA in Al Ain Reception Complex (AARC)